Chennai Corporation starts removing shops for second phase of Blue Flag area on Marina beach January 12, 2026 gopalkumarthakur@gmail.com The second phase is expected to be launched by the end of this month on the Marina beach Related posts: Residents complain about sewage overflow, water stagnation in parts of George Town Transport Dept. cracks down on overloading of trucks; ₹6.3 lakh fine levied on violators WRD’s controlled water discharge strategy helps balance flood management and water conservation Burning of garbage is a persistent problem in several areas, say residents