Tamil Nadu Vellore Corporation lays concrete carriageway without relocating electrical poles November 17, 2025 gopalkumarthakur@gmail.com Tangedco officials said that relocation of electrical poles is done based on the total number of consumers, who would be affected due to power cuts and the type of transmission power lines such as High Tension (HT) and Low Tension (LT). Related posts: Stalin should be credited with turning Tamil Nadu into a top debtor, says EPS Amount of subsidies provided by T.N. government rise between 2019-20 and 2023-24 Two persons held for selling tablets near Walajah Vellore MP flags off low-floor buses for Vellore and Ranipet