Chennai Metro Rail to build tunnel from Thirumayilai to Boat Club via Alwarpet in August
gopalkumarthakur@gmail.com
Two tunnel boring machines are being lowered and assembled at the Thirumayilai station as part of the work; tunnelling on the 2.2-km metro stretch was previously scheduled to begin in June